 |
|
|
 |
Latest News
2009-02-09 EAAB Demo for SmartBall with the water utility of Bogota on a 24" Line was completed succesfully
February 6th 2009 -
The Aqueduct and Sewage Company of Bogota (EAAB) welcomed the report after the inspection of the 24" water trunk line located at the height of 152 Street in Bogota. Pure Technologies along with crew members form Importisa were able to detect three leaks in 2 runs performed to the line.
2009-05-11 Phase 2 of EAAB survey Project over 60" Water Main Trunk Line finished succesfully
The survey of the 60" pipeline was successfully conducted in Bogota. The pipeline is located under the Autopista Norte between street 111th to 92nd. In this inspection a new extraction device designed for large pipes by Pure Technologies within the framework of this project was tested for the first time. A number of 3 leaks were detected during the survey, further details yet to be confirmed.
|
 |
|
|
|
|